Marstal District Heating

The existing installation of 18.000 m2 solar collectors will be increased with 15,000 m2.

The increase of the world largest thermal solar installation in Marstal is 1 out of 11 selected EU energy projects. The existing installation of 18.000 sqm. solar collectors will be increased with 15,000 sqm.

Sunmark is responsible for the turn-key solution including the delivery of solar panels, the heat exchange station and the connection with the biomass boiler, heat pump and ORC.

 

Marstal thermal solar installation 

The thermal solar plant will be finished in 2012 and the total installation will supply 55% of the total energy in Marstal. The remaining heat will come from locally growing willow. A 4MW wood chips boiler is also part of the big project, which ensures that Marstal’s citizens will be 100% supplied by local and sustainable energy sources. A heat storage ensures optimal output of the solar heat far into the autumn.

Next step

Call (+45) 62 53 26 10


Send email


More contact options